RAIL BICYCLE BY KHURDA ROAD DIVISION FOR TRACK INSPECTIONS AND URGENT REPAIRS.
RAIL BICYCLE – A NOVEL MECHANISM TO QUICKLY TRAVEL ON RAIL TRACKS FOR INSPECTIONS, MONITORING & URGENT REPAIRS.
IN HOUSE PREPARATION BY KHURDA ROAD DIVISION.
THE AVERAGE SPEED OF THE RAIL BICYCLE IS 10 KM PER HOUR AND THE MAXIMUM SPEED IS 15 KM PER HOUR.
RAIL BICYCLE CAN BE USED FOR PATROLLING, ENSURING SAFETY AND SECURITY.
Bhubaneswar (Kalinga Voice): In order to inspect, monitor, and repair Railway tracks, the Indian Railways has introduced an innovative Rail bicycle which will help the Railway staff in daily monitoring of the Rail tracks.
These Rail Bicycles were inhouse prepared by Permanent Way (P-Way) units of Khurda Road division by using damaged Rail dolly wheels for balancing the cycle which will be used for mobile patrolling.
There are 18 P-Way units over Khurad Road division out of which eight units i.e Brahmapur, Sompeta, Khurda Road, Gorakanath, Cuttack, Bhadrak, jajpur Keonjhar Road and Dhenkanal units have prepared these Rail Bicycles.
The safety of Railway tracks primarily inspected/monitored and attended to, by Trackmen round the clock irrespective of all odds be it night or day, rain or cold etc. Their movement was also volatile, insecure, and was by walk only. Now with the invention of Rail bicycle which is capable of running on the tracks at an average speed of 10 KMPH, not only the movement of trackman has become easier but also became faster.
The Rail bicycle will help the Railway workers in all seasons. During monsoon seasons, sometimes the situation becomes very difficult, causing unwanted detention of train services. After a heavy shower, bridge approach locations and other vulnerable locations can be easily inspected by the staff in a short span of time with Rail Bicycle. In emergency situations, the bicycle will be very helpful for patrolling during hot weather also.
These Rail bicycles can run at an average speed of 10 Kilo Metre per Hour and at a maximum of 15 Kilo Metre per HouR. It weighs just around 30 kgs, can easily be lifted, assembled and dismantled by one person.
Due to the ongoing COVID19 pandemic, some of the sections over the division are currently closed for the traffic. In these sections, Rail Bicycle can be used for patrolling, ensuring safety and security
Shri Shashi Kant Singh, Divisional Railway Manager, Khurda Road Has appreciated this innovative initiative of the division.